- Safety of Plant Equipment and its Personnel.
- Achieving Targets of Maintenance within scheduled time even before time.
- Time-Reduction in Planned Maintenance Shutdowns (ATAs).
- Never having a ‘bolting-related’ maintenance shut-down; nor the need for ‘HOT BOLTING’.
- Achieving a guaranteed and Certified LEAKAGE-ZERO start up the very first time.
- To reduce the unscheduled maintenance down time due to Bolting related errors and to enhance the productivity and safety of equipment/ manpower